Public Jobs

Bidding Closed
9/24/19 2:00 pm
Cle Elum - Roslyn School District Transportation Facility
Forte Architects
Cle Elum, WA
Construction of a new transportation facility consisting of a new metal building, approximately 22,800 sf, which will contain offices, a driver’s area, maintenance shop, and covered parking for buses; associated site improvements including new access road to Bullfrog Road, storm water control, parking area and fencing.
Bidding Closed
9/10/19 2:00 pm
SSA/OHO Wenatchee Remodel
Forte Architects
Wenatchee, WA
Project consists of remodel of existing (former) city hall building located at 129 South Chelan Street, in Wenatchee, Washington. Building is an approximately 7,435 sf single story, structural masonry building, over an open parking garage. Work consists of selective demolition of both exterior and interior elements including site improvements such as sidewalks, modular retaining walls, landscape; exterior building elements such as non-structural masonry; interior walls, and finishes; sawcutting and removal of portions of exterior walls for new doors and windows. New construction includes new sidewalks and ramps, new landscape, new entry canopy and vestibules, new doors and windows, exterior siding; interior improvements include new walls, ceiling, and finishes. New electrical, plumbing and HVAC systems and structural upgrades are part of the project as well as other Work indicated in the Contract Documents.
Bidding Closed
8/22/19 2:00 pm
Wenatchee Public Library Modernization
Forte Architects
Wenatchee, WA
The project will consist of modernization and remodel of the existing Wenatchee Regional Library building located at 310 Douglas Street, in Wenatchee includes: · New finishes throughout; · Exterior window replacement; · Reconfiguration and replacement of shelves and other fixtures; · Relocation and reconfiguration of the front desk and work areas; · Reconfiguration of mezzanines; · Upgraded restrooms; · Improved ADA access throughout; · New improved lighting throughout (by others); · Updates to HVAC (by others); · Upgrades to plumbing systems; · Upgrades to existing electrical systems.
Bidding Closed
7/25/19 2:00 pm
ORCA Expansion, Foster First (Wenatchee Expansion - CRG)
Forte Architects
Wenatchee, WA
Scope of Work includes: Selective demolition of existing portions of existing building; interior modifications including new walls, doors, finishes, plumbing, electrical, and fire sprinklers in accordance with the Contract Documents. Plumbing, electrical, and fire sprinklers are bidder design.
Bidding Closed
6/6/19 2:00 pm
Index School District Miscellaneous Modifications
Forte Architects
Index, WA
Selective demolition of existing site improvements, and portions of existing school buildings; new sidewalk assemblies; construction of a new 172 sf entry to school building; and a new 160 sf storage room addition to the existing gymnasium building in accordance with the Contract Documents.
Bidding Closed
6/11/19 2:00 pm
Wenatchee Public Library Hazardous Materials Abatement
Forte Architects
Wenatchee, WA
The Work of Project is defined by the Contract Documents and consists of the following: 1. Select asbestos containing materials (ACM) will be abated from the building prior to completion of the renovation bidding and General Contractor selection. The ACM identified for abated in the Early Bid Package includes residual acoustical ceiling texture, vinyl floor tile, and black and yellow floor adhesive abatement. Additionally, select non-ACM materials have been identified for selective demolition including the metal lathe and plaster ceiling system associated with the residual acoustical ceiling texture. Other ACM will remain in-place during the Early Bid Package work and be abated as a portion of a subsequent renovation contract. The ACM that will remain in place at the conclusion of the Early Bid Package work includes white duct tape associated with heating, ventilation and air conditioning (HVAC) ducting, window putty, window glazing, door putty, white seam sealant associated with the rock facia, white seam sealant on building components, roofing, and roof penetration sealants. 2. Lead containing materials (LCM) will be managed concurrent with selective demolition with some materials remaining at the conclusion of the work for future in-place management. 3. Lighting and electrical components (LEC) will be removed for offsite recycling or disposed and consist of predominantly of four-foot fluorescent lamps; magnetic ballasts assumed to contain polychlorinated biphenyl (PCB) or other hazardous constituents; and mercury containing switches. Select lighting fixtures have been identified for Owner retainage and shall either be left in place or staged in a location designated by Owner. 4. Refrigerant containing systems (RCS) will remain in-place during the Early Bid Package work and be decommissioned as a portion of a subsequent renovation contract. The RSC that will remain in place during the Early Bid Package work consists of roof mounted HVAC and associated mechanical room components; a domestic style refrigerator and a chilled drinking water fountain system. 5. and other Work indicated in the Contract Documents.