Public Jobs

Bids due in 3 days
7/25/19 2:00 pm
ORCA Expansion, Foster First (Wenatchee Expansion - CRG)
Forte Architects
Wenatchee, WA
Scope of Work includes: Selective demolition of existing portions of existing building; interior modifications including new walls, doors, finishes, plumbing, electrical, and fire sprinklers in accordance with the Contract Documents. Plumbing, electrical, and fire sprinklers are bidder design.
Bidding Closed
6/6/19 2:00 pm
Index School District Miscellaneous Modifications
Forte Architects
Index, WA
Selective demolition of existing site improvements, and portions of existing school buildings; new sidewalk assemblies; construction of a new 172 sf entry to school building; and a new 160 sf storage room addition to the existing gymnasium building in accordance with the Contract Documents.
Bidding Closed
6/11/19 2:00 pm
Wenatchee Public Library Hazardous Materials Abatement
Forte Architects
Wenatchee, WA
The Work of Project is defined by the Contract Documents and consists of the following: 1. Select asbestos containing materials (ACM) will be abated from the building prior to completion of the renovation bidding and General Contractor selection. The ACM identified for abated in the Early Bid Package includes residual acoustical ceiling texture, vinyl floor tile, and black and yellow floor adhesive abatement. Additionally, select non-ACM materials have been identified for selective demolition including the metal lathe and plaster ceiling system associated with the residual acoustical ceiling texture. Other ACM will remain in-place during the Early Bid Package work and be abated as a portion of a subsequent renovation contract. The ACM that will remain in place at the conclusion of the Early Bid Package work includes white duct tape associated with heating, ventilation and air conditioning (HVAC) ducting, window putty, window glazing, door putty, white seam sealant associated with the rock facia, white seam sealant on building components, roofing, and roof penetration sealants. 2. Lead containing materials (LCM) will be managed concurrent with selective demolition with some materials remaining at the conclusion of the work for future in-place management. 3. Lighting and electrical components (LEC) will be removed for offsite recycling or disposed and consist of predominantly of four-foot fluorescent lamps; magnetic ballasts assumed to contain polychlorinated biphenyl (PCB) or other hazardous constituents; and mercury containing switches. Select lighting fixtures have been identified for Owner retainage and shall either be left in place or staged in a location designated by Owner. 4. Refrigerant containing systems (RCS) will remain in-place during the Early Bid Package work and be decommissioned as a portion of a subsequent renovation contract. The RSC that will remain in place during the Early Bid Package work consists of roof mounted HVAC and associated mechanical room components; a domestic style refrigerator and a chilled drinking water fountain system. 5. and other Work indicated in the Contract Documents.
Bidding Closed
3/28/19 2:00 pm
Don Morse Park Restroom Remodel City of Chelan Parks Department
Forte Architects
Chelan, WA
Remodel of three existing restroom buildings located in Don Morse Park in Chelan, Washington. Work includes, but is not limited to, limited demolition of interior finishes and fixtures, sawcutting and removal of portion of concrete floor; new interior walls, and finishes, new plumbing fixtures, toilet partitions, limited concrete floor slab replacement, new epoxy floor, new lighting.
Bidding Closed
11/14/18 2:00 pm
City of Chelan Parks Department - Maintenance Building
Forte Architects
Chelan, WA
Demolition of existing metal shop building and other site improvements and construction of a new 3,400 sf building to house the City of Chelan’s Parks Department maintenance shops and office. Construction consists of concrete slab on grade, pre-fabricated metal building shell, light-gage metal interior frame construction, HM exterior and interior doors and frames, interior finishes, electrical systems, low voltage wiring, lighting, split system heat pump heating and cooling, associated site work and utilities. New fueling station including concrete pad, cover and drainage system.